Over 40 Years Experience

Specialist Limecrete Floor Systems, installed across the UK

Breathable limecrete floors for listed buildings, period properties and eco-conscious new builds — working with the commonly specified Mike Wye GeoCell® and Ty-Mawr GLAPOR® systems. Free technical advice and free estimates, nationwide.

GeoCell® & GLAPOR® systems Listed & period properties Free technical advice
0+Years Experience
0Leading Specified Systems
0mm+Insulating Foamed Glass Base
100%Free Estimates & Advice
01About Us

Breathable floors, built the right way

Limecrete Solutions UK design and install breathable limecrete floor systems for heritage, period and eco-conscious properties across the United Kingdom.

We are the specialist lime division of the team behind Southwest Screeding Solutions — bringing over four decades of floor screeding expertise to natural hydraulic lime flooring. We can design and install a limecrete floor within the specification of any building regulation or architectural requirement. Using a force action mixer we site mix every floor, and each system works beautifully with underfloor heating.

We work with the two most commonly specified insulated limecrete systems in the UK — the Mike Wye GeoCell® (Glasscrete®) system and the Ty-Mawr SubLime® system with GLAPOR® recycled foamed glass.

We provide free technical advice and free estimates.

Listed BuildingsPeriod PropertiesBarn ConversionsChurches & ChapelsEco New-BuildsUnderfloor Heating
Finished breathable limecrete floor in a restored heritage brick building
40+Years of
experience
100%Breathable build-up
— no DPM required
02The Systems

The UK's most specified limecrete systems

Architects and conservation officers typically specify one of two proven insulated limecrete floor systems. We install both — exactly to the manufacturer's specification.

The Mike Wye GeoCell® System — Glasscrete®

01

The Glasscrete® System

Glasscrete® is the limecrete floor system by Mike Wye which uses foam glass aggregate as its insulating and moisture-managing sub-base. A modern interpretation of traditional solid floors, it comfortably meets modern insulation requirements — ensuring maximum efficiency from underfloor heating. The slab is made of natural hydraulic lime (NHL) and appropriate aggregates rather than a cement binder.

02

GEOCELL Foam Glass Aggregate

A high-quality insulating hardcore made from 99% recycled glass. Non-capillary closed cells that do not absorb water, excellent insulation values (λ = 0.08 W/mK), excellent compressive strength, A1 fire resistant, inert and pH-neutral — and quicker to install, cutting labour time and cost.

03

Made for Old Buildings

Unsympathetic, relatively impervious modern materials can push moisture into ground-level walls — resulting in poor insulation, damp floors and even structural damage. GEOCELL combines a drainage layer and insulation in a single product, dealing with ground moisture at the base of the floor and reducing the overall build-up depth.

Typical Glasscrete® specification: levelled and compacted ground · geotextile membrane · minimum 150mm compacted foam glass aggregate · geotextile membrane · underfloor heating pipes on grid · lime slab of 2 parts aggregate to 1 part NHL5 with cork board perimeter · floor finish.
03The Build-Up

Six layers, one breathable floor

Every insulated limecrete floor is built as a vapour-open sandwich — moisture is managed by the non-capillary foamed glass base rather than trapped by a plastic membrane.

The foamed glass depth is calculated to hit your target U-value, and the whole build-up is site mixed and laid by our own team. Underfloor heating sits directly in the slab or within a separate screed above.

Depths shown are typical minimums — every floor is designed to match your building, ground conditions and target U-value.

05About Our Team

Decades of expertise, on every floor

Our expert team are all leading floor layers with decades of experience and knowledge.

NB

Nick Borg

Director

Nick operates the management of the company and is your direct point of contact on every limecrete project. Nick previously served in the Royal Marines and as a security consultant before entering the building industry.

AG

Alan Griffiths

Director

Alan has over 40 years experience in the flooring industry and has worked on building projects throughout the UK. Alan's skills and knowledge of floor laying — from traditional screeds to breathable limecrete — are un-matched, with a well deserved reputation for quality throughout the building industry.

TG

Tommy Griffiths

Director

Tommy has been laying floors for almost 20 years. He learned the trade from his father Alan. Tommy takes his floors very seriously and has high standards — exactly what a heritage limecrete floor demands.

Restoring a period property? Let's get the floor right.

Free technical advice and free estimates on every limecrete project, UK-wide.

Request a Free Estimate
06Contact Us

Free estimates and advice, across the UK

NB
Nick Borg — Managing Director
Your direct point of contact
Mobile07952 966651 EmailNick@limecretesolutionsuk.co.uk
CoverageBased in the South West — installing UK-wide

Request a free estimate

Tell us about your project and we'll get straight back to you.

Thank you — message sent

Nick will get back to you shortly with your free estimate.
Need us sooner? Call 07952 966651.

We provide free technical advice and free estimates.

Hi, Nick here 👋 How can I help with your project?